Solar Panels in Cabra, Co. Dublin
Located just 2.9 km from Dublin, Cabra receives 1,500+ sunshine hours per year — among the highest in Ireland. A 4kWp system generates approximately 3,660 kWh annually, covering 87% of average household electricity use and saving an estimated €1098+ per year. With the SEAI grant of up to €1,800 and 0% VAT, the net cost is €3,200–€6,200 with payback in 4–6 years.
How much solar energy can you generate in Cabra?
Solar Yield
4kWp Output
Sunshine
Est. Savings
Household Coverage
Eircode Area
Dist. to Dublin
Location
Based on county-level solar data for Dublin. Actual output varies by roof orientation, shading, and system specification.
Solar Power in Cabra, Co. Dublin
Cabra is a area near the county town in Co. Dublin. It is conveniently close to Dublin (2.9 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Cabra is D07 — you'll need your full Eircode when applying for the SEAI grant. Co. Dublin ranks #4 in Ireland for solar yield, making Cabra an excellent location for solar panels.
Advantages of Solar Energy for Cabra Homeowners
Save on Electricity Bills
Homeowners in Cabra can save an estimated €1098+ per year on electricity with a 4kWp solar system generating 3,660 kWh annually.
SEAI Grant — Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing — apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Top Solar County in Ireland
Co. Dublin ranks #4 in Ireland for solar yield with 915 kWh/kWp. Homes in Cabra benefit from some of the best solar conditions in the country.
25+ Year Lifespan
A system installed in Cabra today will generate clean electricity for 25-30 years with minimal maintenance.
What SEAI grants can Cabra homeowners claim?
Homeowners in Cabra, Co. Dublin can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Dublin
SEAI registered solar panel installers covering Dublin.
Solar Panels in Areas Near Cabra
Also serving nearby areas in Dublin:
Find Solar Installers in Dublin
Browse SEAI-registered installers covering Cabra and all of Dublin.
Common Questions About Going Solar in Cabra
How much do solar panels cost in Cabra?
A 4kWp system in Cabra typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,660 kWh/year, paying for itself in 4-6 years.
How much electricity will solar panels generate in Cabra?
Based on Dublin county data, a 4kWp system in Cabra generates approximately 3,660 kWh per year — covering 87% of average household use (4,200 kWh/year). Dublin receives around 1,500 sunshine hours annually.
Are solar panels worth it in Cabra?
Yes. With estimated savings of €1098+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in Cabra pays for itself in 4-6 years and lasts 25+ years.
Can I get solar panels on an east or west facing roof in Cabra?
Yes. East or west-facing roofs still produce 80-85% of the output of a south-facing roof. Many installers recommend splitting panels across east and west to spread generation throughout the day, which can actually improve self-consumption.
How do I get the SEAI grant in Cabra?
Apply online at seai.ie with your MPRN and Eircode. Use an SEAI-registered installer. Do not start work before your Letter of Offer. After installation, complete a BER assessment. The grant is paid to your bank within 4-6 weeks.
What maintenance do solar panels need?
Solar panels need very little maintenance. Rain keeps them clean in most cases. There are no moving parts. Your inverter may need replacing once in 25 years (10-15 year lifespan). Annual visual checks and occasional cleaning if near trees is all that's needed.
Sources
Last updated: February 2026
Reviewed by the Solar Info editorial team. Editorial policy
Get a Free Solar Quote in Cabra
Connect with SEAI-registered installers covering Cabra, Co. Dublin.