Solar Panels in Kilmore, Co. Dublin
Kilmore is a village in Co. Dublin with a population of around 194. Located 12.7 km from Dublin, the area receives 1,500+ sunshine hours per year. A 4kWp solar system generates approximately 3,660 kWh annually — saving an estimated €1098+ per year. The SEAI grant of up to €1,800 and 0% VAT bring the net cost to €3,200–€6,200.
What is the solar potential in Kilmore?
Solar Yield
4kWp Output
Sunshine
Est. Savings
Household Coverage
Population
Eircode Area
Dist. to Dublin
Location
Based on county-level solar data for Dublin. Actual output varies by roof orientation, shading, and system specification.
About Solar Energy in Kilmore
Kilmore is a village in Co. Dublin with a population of 194 (CSO Census 2022). It is a short drive from Dublin (12.7 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Kilmore is D18 — you'll need your full Eircode when applying for the SEAI grant. Co. Dublin ranks #4 in Ireland for solar yield, making Kilmore an excellent location for solar panels.
Benefits of Solar Panels in Kilmore
Save on Electricity Bills
Homeowners in Kilmore can save an estimated €1098+ per year on electricity with a 4kWp solar system generating 3,660 kWh annually.
SEAI Grant — Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing — apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Top Solar County in Ireland
Co. Dublin ranks #4 in Ireland for solar yield with 915 kWh/kWp. Homes in Kilmore benefit from some of the best solar conditions in the country.
25+ Year Lifespan
A system installed in Kilmore today will generate clean electricity for 25-30 years with minimal maintenance.
Government Support for Solar in Kilmore
Homeowners in Kilmore, Co. Dublin can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Dublin
SEAI registered solar panel installers covering Dublin.
Where can you find solar installers near Kilmore?
Also serving nearby areas in Dublin:
Find Solar Installers in Dublin
Browse SEAI-registered installers covering Kilmore and all of Dublin.
Solar Panel FAQs for Kilmore
How much do solar panels cost in Kilmore?
A 4kWp system in Kilmore typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,660 kWh/year, paying for itself in 4-6 years.
How much electricity will solar panels generate in Kilmore?
Based on Dublin county data, a 4kWp system in Kilmore generates approximately 3,660 kWh per year — covering 87% of average household use (4,200 kWh/year). Dublin receives around 1,500 sunshine hours annually.
Are solar panels worth it in Kilmore?
Yes. With estimated savings of €1098+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in Kilmore pays for itself in 4-6 years and lasts 25+ years.
What happens during a power cut?
Standard grid-tied solar systems shut down during a power cut for safety reasons (to protect ESB workers). If you need backup power, you can install a hybrid inverter with battery storage that provides power during outages.
What maintenance do solar panels need?
Solar panels need very little maintenance. Rain keeps them clean in most cases. There are no moving parts. Your inverter may need replacing once in 25 years (10-15 year lifespan). Annual visual checks and occasional cleaning if near trees is all that's needed.
What is the Microgeneration Support Scheme?
The Microgeneration Support Scheme allows homeowners to sell surplus solar electricity back to the grid at 15-25c/kWh. You need a smart meter (free from ESB Networks) and a grid-connected system. The first €400/year of export income is tax-free.
Sources
Last updated: February 2026
Reviewed by the Solar Info editorial team. Editorial policy
Get a Free Solar Quote in Kilmore
Connect with SEAI-registered installers covering Kilmore, Co. Dublin.