Solar Panels in Lusk, Co. Dublin
Lusk, Co. Dublin, receives 1,500+ sunshine hours per year — among the highest in Ireland. A 4kWp system generates approximately 3,660 kWh annually, covering 87% of average household electricity use and saving an estimated €1098+ per year. With the SEAI grant of up to €1,800 and 0% VAT, the net cost is €3,200–€6,200 with payback in 4–6 years.
What is the solar potential in Lusk?
Solar Yield
4kWp Output
Sunshine
Est. Savings
Household Coverage
Population
Eircode Area
Dist. to Dublin
Location
Based on county-level solar data for Dublin. Actual output varies by roof orientation, shading, and system specification.
About Solar Energy in Lusk
Lusk is a town in Co. Dublin with a population of 8,514 (CSO Census 2022). It is a short drive from Dublin (20.5 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Lusk is K32 — you'll need your full Eircode when applying for the SEAI grant. Co. Dublin ranks #4 in Ireland for solar yield, making Lusk an excellent location for solar panels.
Benefits of Solar Panels in Lusk
Save on Electricity Bills
Homeowners in Lusk can save an estimated €1098+ per year on electricity with a 4kWp solar system generating 3,660 kWh annually.
SEAI Grant — Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing — apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Top Solar County in Ireland
Co. Dublin ranks #4 in Ireland for solar yield with 915 kWh/kWp. Homes in Lusk benefit from some of the best solar conditions in the country.
25+ Year Lifespan
A system installed in Lusk today will generate clean electricity for 25-30 years with minimal maintenance.
Government Support for Solar in Lusk
Homeowners in Lusk, Co. Dublin can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Dublin
SEAI registered solar panel installers covering Dublin.
Where can you find solar installers near Lusk?
Also serving nearby areas in Dublin:
Find Solar Installers in Dublin
Browse SEAI-registered installers covering Lusk and all of Dublin.
Solar Panel FAQs for Lusk
How much do solar panels cost in Lusk?
A 4kWp system in Lusk typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,660 kWh/year, paying for itself in 4-6 years.
How much electricity will solar panels generate in Lusk?
Based on Dublin county data, a 4kWp system in Lusk generates approximately 3,660 kWh per year — covering 87% of average household use (4,200 kWh/year). Dublin receives around 1,500 sunshine hours annually.
Are solar panels worth it in Lusk?
Yes. With estimated savings of €1098+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in Lusk pays for itself in 4-6 years and lasts 25+ years.
What roof direction is best for solar panels in Lusk?
South-facing roofs produce the most electricity (100% of potential). South-east and south-west roofs produce around 95%. East or west-facing roofs still produce 80-85%. North-facing roofs are generally not recommended for solar panels in Ireland.
Can I add a battery to my solar system?
Yes. A home battery (typically 5-10 kWh) stores excess solar electricity for evening use. This increases your self-consumption from around 30-40% to 60-80%. Batteries currently cost €3,000-€6,000 and are not yet covered by the SEAI grant.
How long does solar panel installation take?
A typical residential installation takes 1-2 days. This includes scaffolding, mounting the panels, wiring, inverter installation, and connecting to the grid. Your installer handles the ESB Networks notification (NC6 form).
Sources
Last updated: February 2026
Reviewed by the Solar Info editorial team. Editorial policy
Get a Free Solar Quote in Lusk
Connect with SEAI-registered installers covering Lusk, Co. Dublin.