Solar Panels in Jenkinstown, Co. Kilkenny
Jenkinstown is a village in Co. Kilkenny with a population of around 416. Located 8.7 km from Kilkenny, the area receives 1,360+ sunshine hours per year. A 4kWp solar system generates approximately 3,620 kWh annually — saving an estimated €1086+ per year. The SEAI grant of up to €1,800 and 0% VAT bring the net cost to €3,200–€6,200.
How much solar energy can you generate in Jenkinstown?
Solar Yield
4kWp Output
Sunshine
Est. Savings
Household Coverage
Population
Eircode Area
Dist. to Kilkenny
Location
Based on county-level solar data for Kilkenny. Actual output varies by roof orientation, shading, and system specification.
Solar Power in Jenkinstown, Co. Kilkenny
Jenkinstown is a village in Co. Kilkenny with a population of 416 (CSO Census 2022). It is conveniently close to Kilkenny (8.7 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Jenkinstown is R95 — you'll need your full Eircode when applying for the SEAI grant. Co. Kilkenny ranks #7 in Ireland for solar yield, making Jenkinstown an excellent location for solar panels.
Advantages of Solar Energy for Jenkinstown Homeowners
Save on Electricity Bills
Homeowners in Jenkinstown can save an estimated €1086+ per year on electricity with a 4kWp solar system generating 3,620 kWh annually.
SEAI Grant — Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing — apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Top Solar County in Ireland
Co. Kilkenny ranks #7 in Ireland for solar yield with 905 kWh/kWp. Homes in Jenkinstown benefit from some of the best solar conditions in the country.
25+ Year Lifespan
A system installed in Jenkinstown today will generate clean electricity for 25-30 years with minimal maintenance.
What SEAI grants can Jenkinstown homeowners claim?
Homeowners in Jenkinstown, Co. Kilkenny can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Kilkenny
SEAI registered solar panel installers covering Kilkenny.
Solar Panels in Areas Near Jenkinstown
Also serving nearby areas in Kilkenny:
Find Solar Installers in Kilkenny
Browse SEAI-registered installers covering Jenkinstown and all of Kilkenny.
Common Questions About Going Solar in Jenkinstown
How much do solar panels cost in Jenkinstown?
A 4kWp system in Jenkinstown typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,620 kWh/year, paying for itself in 4-6 years.
How much electricity will solar panels generate in Jenkinstown?
Based on Kilkenny county data, a 4kWp system in Jenkinstown generates approximately 3,620 kWh per year — covering 86% of average household use (4,200 kWh/year). Kilkenny receives around 1,360 sunshine hours annually.
Are solar panels worth it in Jenkinstown?
Yes. With estimated savings of €1086+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in Jenkinstown pays for itself in 4-6 years and lasts 25+ years.
What maintenance do solar panels need?
Solar panels need very little maintenance. Rain keeps them clean in most cases. There are no moving parts. Your inverter may need replacing once in 25 years (10-15 year lifespan). Annual visual checks and occasional cleaning if near trees is all that's needed.
Can I add a battery to my solar system?
Yes. A home battery (typically 5-10 kWh) stores excess solar electricity for evening use. This increases your self-consumption from around 30-40% to 60-80%. Batteries currently cost €3,000-€6,000 and are not yet covered by the SEAI grant.
What is the payback period for solar panels in Jenkinstown?
With a net cost of €3,200-€6,200 after the SEAI grant and savings of €1086+ per year plus export income, a typical solar system in Jenkinstown pays for itself in 4-6 years. After payback, you get 20+ years of near-free electricity.
Sources
Last updated: February 2026
Reviewed by the Solar Info editorial team. Editorial policy
Get a Free Solar Quote in Jenkinstown
Connect with SEAI-registered installers covering Jenkinstown, Co. Kilkenny.