Solar Panels in Dromahair, Co. Leitrim
Dromahair is a small town in Co. Leitrim with a population of around 939. Located 34.4 km from Carrick-on-Shannon, the area receives 1,150+ sunshine hours per year. A 4kWp solar system generates approximately 3,368 kWh annually — saving an estimated €1010+ per year. The SEAI grant of up to €1,800 and 0% VAT bring the net cost to €3,200–€6,200.
Dromahair solar yield and performance data
Solar Yield
4kWp Output
Sunshine
Est. Savings
Household Coverage
Population
Eircode Area
Dist. to Carrick-on-Shannon
Location
Based on county-level solar data for Leitrim. Actual output varies by roof orientation, shading, and system specification.
Dromahair and Renewable Energy
Dromahair is a small town in Co. Leitrim with a population of 939 (CSO Census 2022). It is accessible from Carrick-on-Shannon (34.4 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Dromahair is F91 — you'll need your full Eircode when applying for the SEAI grant.
Why Go Solar in Dromahair?
Save on Electricity Bills
Homeowners in Dromahair can save an estimated €1010+ per year on electricity with a 4kWp solar system generating 3,368 kWh annually.
SEAI Grant — Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing — apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Energy Independence
For homes in rural Dromahair, solar panels provide energy security and reduced reliance on the grid. Combined with a battery, you can store power for evening use.
25+ Year Lifespan
A system installed in Dromahair today will generate clean electricity for 25-30 years with minimal maintenance.
SEAI Solar Grant for Dromahair Residents
Homeowners in Dromahair, Co. Leitrim can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Leitrim
SEAI registered solar panel installers covering Leitrim.
Nearby Towns Also Served
Also serving nearby areas in Leitrim:
Find Solar Installers in Leitrim
Browse SEAI-registered installers covering Dromahair and all of Leitrim.
Frequently Asked Questions About Solar Panels in Dromahair
How much do solar panels cost in Dromahair?
A 4kWp system in Dromahair typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,368 kWh/year, paying for itself in 4-6 years.
How much electricity will solar panels generate in Dromahair?
Based on Leitrim county data, a 4kWp system in Dromahair generates approximately 3,368 kWh per year — covering 80% of average household use (4,200 kWh/year). Leitrim receives around 1,150 sunshine hours annually.
Are solar panels worth it in Dromahair?
Yes. With estimated savings of €1010+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in Dromahair pays for itself in 4-6 years and lasts 25+ years.
What roof direction is best for solar panels in Dromahair?
South-facing roofs produce the most electricity (100% of potential). South-east and south-west roofs produce around 95%. East or west-facing roofs still produce 80-85%. North-facing roofs are generally not recommended for solar panels in Ireland.
How does shading affect solar panels in Dromahair?
Shading from trees, chimneys, or nearby buildings can reduce output significantly. Modern systems use optimisers or microinverters so that shading on one panel doesn't drag down the whole system. Your installer will assess shading during the site survey.
How do I get the SEAI grant in Dromahair?
Apply online at seai.ie with your MPRN and Eircode. Use an SEAI-registered installer. Do not start work before your Letter of Offer. After installation, complete a BER assessment. The grant is paid to your bank within 4-6 weeks.
Sources
Last updated: February 2026
Reviewed by the Solar Info editorial team. Editorial policy
Get a Free Solar Quote in Dromahair
Connect with SEAI-registered installers covering Dromahair, Co. Leitrim.