Solar Panels in Kinlough, Co. Leitrim
Kinlough is a small town in Co. Leitrim with a population of around 1,196. Located 57.2 km from Carrick-on-Shannon, the area receives 1,150+ sunshine hours per year. A 4kWp solar system generates approximately 3,368 kWh annually — saving an estimated €1010+ per year. The SEAI grant of up to €1,800 and 0% VAT bring the net cost to €3,200–€6,200.
Kinlough solar yield and performance data
Solar Yield
4kWp Output
Sunshine
Est. Savings
Household Coverage
Population
Eircode Area
Dist. to Carrick-on-Shannon
Location
Based on county-level solar data for Leitrim. Actual output varies by roof orientation, shading, and system specification.
Kinlough and Renewable Energy
Kinlough is a small town in Co. Leitrim with a population of 1,196 (CSO Census 2022). It is located away from Carrick-on-Shannon (57.2 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Kinlough is F92 — you'll need your full Eircode when applying for the SEAI grant.
Why Go Solar in Kinlough?
Save on Electricity Bills
Homeowners in Kinlough can save an estimated €1010+ per year on electricity with a 4kWp solar system generating 3,368 kWh annually.
SEAI Grant — Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing — apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Energy Independence
For homes in rural Kinlough, solar panels provide energy security and reduced reliance on the grid. Combined with a battery, you can store power for evening use.
25+ Year Lifespan
A system installed in Kinlough today will generate clean electricity for 25-30 years with minimal maintenance.
SEAI Solar Grant for Kinlough Residents
Homeowners in Kinlough, Co. Leitrim can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Leitrim
SEAI registered solar panel installers covering Leitrim.
Nearby Towns Also Served
Also serving nearby areas in Leitrim:
Find Solar Installers in Leitrim
Browse SEAI-registered installers covering Kinlough and all of Leitrim.
Frequently Asked Questions About Solar Panels in Kinlough
How much do solar panels cost in Kinlough?
A 4kWp system in Kinlough typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,368 kWh/year, paying for itself in 4-6 years.
How much electricity will solar panels generate in Kinlough?
Based on Leitrim county data, a 4kWp system in Kinlough generates approximately 3,368 kWh per year — covering 80% of average household use (4,200 kWh/year). Leitrim receives around 1,150 sunshine hours annually.
Are solar panels worth it in Kinlough?
Yes. With estimated savings of €1010+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in Kinlough pays for itself in 4-6 years and lasts 25+ years.
What is a BER assessment and do I need one?
A Building Energy Rating (BER) assessment is required after installing solar panels to claim the SEAI grant. A BER assessor visits your home and rates its energy efficiency from A1 to G. Solar panels typically improve your BER by 1-2 grades. The assessment costs around €150-€200.
Do I need to clean my solar panels?
In most cases, rain keeps solar panels clean enough in Ireland. If your panels are near trees or at a low angle, an annual clean may improve output by 2-5%. Never use abrasive materials — a soft brush and water is sufficient.
How long does solar panel installation take?
A typical residential installation takes 1-2 days. This includes scaffolding, mounting the panels, wiring, inverter installation, and connecting to the grid. Your installer handles the ESB Networks notification (NC6 form).
Sources
Last updated: February 2026
Reviewed by the Solar Info editorial team. Editorial policy
Get a Free Solar Quote in Kinlough
Connect with SEAI-registered installers covering Kinlough, Co. Leitrim.