Solar Panels in South Circular Road, Co. Limerick
Located just 1.3 km from Limerick, South Circular Road receives 1,281+ sunshine hours per year — ideal conditions for solar energy. A 4kWp system generates approximately 3,476 kWh annually, covering 83% of average household electricity use and saving an estimated €1043+ per year. With the SEAI grant of up to €1,800 and 0% VAT, the net cost is €3,200–€6,200 with payback in 4–6 years.
How much solar energy can you generate in South Circular Road?
Solar Yield
4kWp Output
Sunshine
Est. Savings
Household Coverage
Eircode Area
Dist. to Limerick
Location
Based on county-level solar data for Limerick. Actual output varies by roof orientation, shading, and system specification.
Solar Power in South Circular Road, Co. Limerick
South Circular Road is a area near the county town in Co. Limerick. It is conveniently close to Limerick (1.3 km), where most SEAI-registered installers in the county are based. The Eircode routing key for South Circular Road is V94 — you'll need your full Eircode when applying for the SEAI grant.
Advantages of Solar Energy for South Circular Road Homeowners
Save on Electricity Bills
Homeowners in South Circular Road can save an estimated €1043+ per year on electricity with a 4kWp solar system generating 3,476 kWh annually.
SEAI Grant — Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing — apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Increase Property Value
Solar panels improve your BER rating and can add up to 4% to your property value.
25+ Year Lifespan
A system installed in South Circular Road today will generate clean electricity for 25-30 years with minimal maintenance.
What SEAI grants can South Circular Road homeowners claim?
Homeowners in South Circular Road, Co. Limerick can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Limerick
SEAI registered solar panel installers covering Limerick.
Solar Panels in Areas Near South Circular Road
Also serving nearby areas in Limerick:
Find Solar Installers in Limerick
Browse SEAI-registered installers covering South Circular Road and all of Limerick.
Common Questions About Going Solar in South Circular Road
How much do solar panels cost in South Circular Road?
A 4kWp system in South Circular Road typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,476 kWh/year, paying for itself in 4-6 years.
How much electricity will solar panels generate in South Circular Road?
Based on Limerick county data, a 4kWp system in South Circular Road generates approximately 3,476 kWh per year — covering 83% of average household use (4,200 kWh/year). Limerick receives around 1,281 sunshine hours annually.
Are solar panels worth it in South Circular Road?
Yes. With estimated savings of €1043+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in South Circular Road pays for itself in 4-6 years and lasts 25+ years.
Do I need to clean my solar panels?
In most cases, rain keeps solar panels clean enough in Ireland. If your panels are near trees or at a low angle, an annual clean may improve output by 2-5%. Never use abrasive materials — a soft brush and water is sufficient.
Do solar panels work in winter in Limerick?
Yes, solar panels generate electricity all year round. While output is lower in winter, Limerick still receives usable daylight hours even in December. Annual generation figures (3,476 kWh for a 4kWp system) already account for seasonal variation.
How long does solar panel installation take?
A typical residential installation takes 1-2 days. This includes scaffolding, mounting the panels, wiring, inverter installation, and connecting to the grid. Your installer handles the ESB Networks notification (NC6 form).
Sources
Last updated: February 2026
Reviewed by the Solar Info editorial team. Editorial policy
Get a Free Solar Quote in South Circular Road
Connect with SEAI-registered installers covering South Circular Road, Co. Limerick.