Solar Panels in Longford Town, Co. Longford
Longford Town is one of the larger towns in Co. Longford with a population of 10,952. With 1,285+ sunshine hours per year, solar energy is a strong investment for homeowners here. A typical 4kWp system generates approximately 3,416 kWh annually — covering 81% of average household electricity use. After the SEAI grant of up to €1,800 and 0% VAT, the net cost is €3,200–€6,200 with payback in 4–6 years.
Longford Town solar yield and performance data
Solar Yield
4kWp Output
Sunshine
Est. Savings
Household Coverage
Population
Eircode Area
Dist. to Longford
Location
Based on county-level solar data for Longford. Actual output varies by roof orientation, shading, and system specification.
Longford Town and Renewable Energy
Longford Town is a large town in Co. Longford with a population of 10,952 (CSO Census 2022). It is conveniently close to Longford (0.2 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Longford Town is N37 — you'll need your full Eircode when applying for the SEAI grant.
Why Go Solar in Longford Town?
Save on Electricity Bills
Homeowners in Longford Town can save an estimated €1025+ per year on electricity with a 4kWp solar system generating 3,416 kWh annually.
SEAI Grant — Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing — apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Increase Property Value
Solar panels improve your BER rating and can add up to 4% to your property value.
25+ Year Lifespan
A system installed in Longford Town today will generate clean electricity for 25-30 years with minimal maintenance.
SEAI Solar Grant for Longford Town Residents
Homeowners in Longford Town, Co. Longford can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Longford
SEAI registered solar panel installers covering Longford.
Nearby Towns Also Served
Also serving nearby areas in Longford:
Find Solar Installers in Longford
Browse SEAI-registered installers covering Longford Town and all of Longford.
Frequently Asked Questions About Solar Panels in Longford Town
How much do solar panels cost in Longford Town?
A 4kWp system in Longford Town typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,416 kWh/year, paying for itself in 4-6 years.
How much electricity will solar panels generate in Longford Town?
Based on Longford county data, a 4kWp system in Longford Town generates approximately 3,416 kWh per year — covering 81% of average household use (4,200 kWh/year). Longford receives around 1,285 sunshine hours annually.
Are solar panels worth it in Longford Town?
Yes. With estimated savings of €1025+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in Longford Town pays for itself in 4-6 years and lasts 25+ years.
How do I get the SEAI grant in Longford Town?
Apply online at seai.ie with your MPRN and Eircode. Use an SEAI-registered installer. Do not start work before your Letter of Offer. After installation, complete a BER assessment. The grant is paid to your bank within 4-6 weeks.
What happens to my solar panels if I move house in Longford Town?
Solar panels stay with the property — they're a permanent fixture. They add value to your home for the next buyer. The SEAI grant does not need to be repaid if you sell. Your installer can transfer monitoring accounts to the new owner.
Is my roof suitable for solar panels in Longford Town?
Most roofs are suitable. You need at least 15-20 m² of unshaded roof space for a typical 4kWp system (10 panels). South, east, or west-facing roofs work well. Your installer will assess your roof's orientation, angle, and structural suitability during a site survey.
Sources
Last updated: February 2026
Reviewed by the Solar Info editorial team. Editorial policy
Get a Free Solar Quote in Longford Town
Connect with SEAI-registered installers covering Longford Town, Co. Longford.