Solar Panels in Blacksod, Co. Mayo
Blacksod, in rural Co. Mayo, receives 1,105+ sunshine hours per year — ideal conditions for solar energy. A 4kWp system generates approximately 3,364 kWh annually, covering 80% of average household electricity use and saving an estimated €1009+ per year. With the SEAI grant of up to €1,800 and 0% VAT, the net cost is €3,200–€6,200 with payback in 4–6 years.
Blacksod solar yield and performance data
Solar Yield
4kWp Output
Sunshine
Est. Savings
Household Coverage
Eircode Area
Dist. to Castlebar
Location
Based on county-level solar data for Mayo. Actual output varies by roof orientation, shading, and system specification.
Blacksod and Renewable Energy
Blacksod is a rural area in Co. Mayo. It is located away from Castlebar (63 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Blacksod is F28 — you'll need your full Eircode when applying for the SEAI grant.
Why Go Solar in Blacksod?
Save on Electricity Bills
Homeowners in Blacksod can save an estimated €1009+ per year on electricity with a 4kWp solar system generating 3,364 kWh annually.
SEAI Grant — Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing — apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Energy Independence
For homes in rural Blacksod, solar panels provide energy security and reduced reliance on the grid. Combined with a battery, you can store power for evening use.
25+ Year Lifespan
A system installed in Blacksod today will generate clean electricity for 25-30 years with minimal maintenance.
SEAI Solar Grant for Blacksod Residents
Homeowners in Blacksod, Co. Mayo can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Mayo
SEAI registered solar panel installers covering Mayo.
Nearby Towns Also Served
Also serving nearby areas in Mayo:
Find Solar Installers in Mayo
Browse SEAI-registered installers covering Blacksod and all of Mayo.
Frequently Asked Questions About Solar Panels in Blacksod
How much do solar panels cost in Blacksod?
A 4kWp system in Blacksod typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,364 kWh/year, paying for itself in 4-6 years.
How much electricity will solar panels generate in Blacksod?
Based on Mayo county data, a 4kWp system in Blacksod generates approximately 3,364 kWh per year — covering 80% of average household use (4,200 kWh/year). Mayo receives around 1,105 sunshine hours annually.
Are solar panels worth it in Blacksod?
Yes. With estimated savings of €1009+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in Blacksod pays for itself in 4-6 years and lasts 25+ years.
What is a BER assessment and do I need one?
A Building Energy Rating (BER) assessment is required after installing solar panels to claim the SEAI grant. A BER assessor visits your home and rates its energy efficiency from A1 to G. Solar panels typically improve your BER by 1-2 grades. The assessment costs around €150-€200.
What is the Microgeneration Support Scheme?
The Microgeneration Support Scheme allows homeowners to sell surplus solar electricity back to the grid at 15-25c/kWh. You need a smart meter (free from ESB Networks) and a grid-connected system. The first €400/year of export income is tax-free.
Do solar panels work in winter in Mayo?
Yes, solar panels generate electricity all year round. While output is lower in winter, Mayo still receives usable daylight hours even in December. Annual generation figures (3,364 kWh for a 4kWp system) already account for seasonal variation.
Sources
Last updated: February 2026
Reviewed by the Solar Info editorial team. Editorial policy
Get a Free Solar Quote in Blacksod
Connect with SEAI-registered installers covering Blacksod, Co. Mayo.