Solar Panels in Dromore West, Co. Sligo
Dromore West is a village in Co. Sligo with a population of around 292. Located 26.1 km from Sligo, the area receives 1,150+ sunshine hours per year. A 4kWp solar system generates approximately 3,388 kWh annually — saving an estimated €1016+ per year. The SEAI grant of up to €1,800 and 0% VAT bring the net cost to €3,200–€6,200.
How much solar energy can you generate in Dromore West?
Solar Yield
4kWp Output
Sunshine
Est. Savings
Household Coverage
Population
Eircode Area
Dist. to Sligo
Location
Based on county-level solar data for Sligo. Actual output varies by roof orientation, shading, and system specification.
Solar Power in Dromore West, Co. Sligo
Dromore West is a village in Co. Sligo with a population of 292 (CSO Census 2022). It is accessible from Sligo (26.1 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Dromore West is F52 — you'll need your full Eircode when applying for the SEAI grant.
Advantages of Solar Energy for Dromore West Homeowners
Save on Electricity Bills
Homeowners in Dromore West can save an estimated €1016+ per year on electricity with a 4kWp solar system generating 3,388 kWh annually.
SEAI Grant — Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing — apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Increase Property Value
Solar panels improve your BER rating and can add up to 4% to your property value.
25+ Year Lifespan
A system installed in Dromore West today will generate clean electricity for 25-30 years with minimal maintenance.
What SEAI grants can Dromore West homeowners claim?
Homeowners in Dromore West, Co. Sligo can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Sligo
SEAI registered solar panel installers covering Sligo.
Solar Panels in Areas Near Dromore West
Also serving nearby areas in Sligo:
Find Solar Installers in Sligo
Browse SEAI-registered installers covering Dromore West and all of Sligo.
Common Questions About Going Solar in Dromore West
How much do solar panels cost in Dromore West?
A 4kWp system in Dromore West typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,388 kWh/year, paying for itself in 4-6 years.
How much electricity will solar panels generate in Dromore West?
Based on Sligo county data, a 4kWp system in Dromore West generates approximately 3,388 kWh per year — covering 81% of average household use (4,200 kWh/year). Sligo receives around 1,150 sunshine hours annually.
Are solar panels worth it in Dromore West?
Yes. With estimated savings of €1016+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in Dromore West pays for itself in 4-6 years and lasts 25+ years.
What maintenance do solar panels need?
Solar panels need very little maintenance. Rain keeps them clean in most cases. There are no moving parts. Your inverter may need replacing once in 25 years (10-15 year lifespan). Annual visual checks and occasional cleaning if near trees is all that's needed.
Do solar panels increase property value in Dromore West?
Yes. Solar panels improve your BER rating and can increase property value by up to 4%. Buyers increasingly look for energy-efficient homes with lower running costs. A solar system in Dromore West is a long-term investment in your property.
How do I get the SEAI grant in Dromore West?
Apply online at seai.ie with your MPRN and Eircode. Use an SEAI-registered installer. Do not start work before your Letter of Offer. After installation, complete a BER assessment. The grant is paid to your bank within 4-6 weeks.
Sources
Last updated: February 2026
Reviewed by the Solar Info editorial team. Editorial policy
Get a Free Solar Quote in Dromore West
Connect with SEAI-registered installers covering Dromore West, Co. Sligo.